One part or ten thousand · One roof

5-axis machining, EDM, welding and CMM without leaving the building.

Darpo machines, welds, inspects and assembles under a single ISO 9001 system. Upload your STEP file and get a quote in 24 hours.

Quote now — quote <24 h See the machine list ISO 9001:2016 quality certificate

STEP, IGES, X_T, DXF or a PDF drawing. NDA on request.

ISO 9001:2016 Certified hyperMILL partner Min. 1 piece
Request a quoteResponse < 24 h
Processes required
CNC machining (5-axis)CNC machining (3-axis) TurningWire EDM Welding and assembly
Upload your CAD files or drag and drop
STEP · IGES · X_T · DWG · DXF · PDF · ZIP
Up to 20 files, 200 MB each
Continue to project details
01 · Shop data
Darpo — shop dataSheet 01
PropertyValueRemark
Quote turnaround< 24 hDFM notes included, no charge
CNC machines on the floor155-axis, 3-axis and turning
Processes under one roof6Milling · turning · wire EDM · welding · CMM · assembly
Quality systemISO 90012016 revision, CMM-verified reports

Machine-by-machine envelopes and tolerances are on the capabilities sheet.

02 · Solutions
Prototyping

One-off parts, machined by people who read drawings

From a single part, up to 3-day lead time, quote in 24 hours.

  • Quote in 24 h from a STEP file
  • Quantity of one, always accepted
  • CMM report with the first article
  • Design for manufacturing (DFM)
Quote now
Production

Production at scale, at the lowest cost

Nothing gets re-qualified when volume arrives: the same programs, the same fixtures, the same inspection plan, scaled onto the Haas and Hision cells. Sub-assemblies leave as finished units, not boxes of parts.

  • Scheduled releases and kanban pulls
  • Welded assemblies: TIG, MIG and laser
  • Robotic lines designed and built in house
Request a quote
Automation

Production lines with Okuma robots, designed and built by Darpo

From the time study to start-up: structure, fixtures, vision and robot integrated under a single contract.

  • Free on-floor walkthrough
  • Fixtures and end effectors machined in house
  • One contract, cycle time and date committed
See line automation
03 · Under one roof

Multiple services in one place

Most of what gets lost in a machined assembly gets lost between suppliers: in transit, in re-fixturing, in the argument over whose tolerance moved. Darpo owns the whole chain, so the part crosses a hallway instead of a border.

01

Machining

5-axis, 3-axis and turning in one queue, with DFM review.

02

Wire EDM

Sharp internal corners, hardened stock.

03

Welding

TIG, MIG and laser on fixtured joints.

04

CMM

Inspection sits inside the routing, not after it.

05

Assembly

A finished unit ships against a single purchase order.

06 Coming soon · Q1 2027

Post-process

Anodizing · Alodine · Electropolishing

04 · Quality

Certified, 2016 revision

One documented system covers machining, welding, inspection and assembly. Open to customer audit; certificate available for your supplier file.

Dimensional verification

First article, full dimensional and per-lot sampling. The report travels with the shipment, so receiving does not wait for someone to ask.

Programming partner

Simultaneous 5-axis strategies verified in simulation before we touch material: fewer trial cycles and a finish that does not depend on polishing.

Material and certificates

Heat number, lot and special process tied to the part number. One file per shipment, ready for a customer audit.

Is there a drawing on your desk right now?

Upload it today and tomorrow you have price, lead time and manufacturing notes from an engineer who has already seen the part.

Upload a part