Capabilities sheet

Fifteen machines, one supplier number.

Everything below sits on the same floor: 5- and 3-axis milling, turning, wire EDM, welding, metrology and assembly. For purchasing that means one order, one shipment and one person accountable when something changes.

ISO 9001:2016 hyperMILL partner Minimum quantity: 1 piece
Equipment list
ProcessEquipmentQtyTypical use
5-axis millingAxile (hyperMILL)1Complex geometry in a single setup
3-axis millingHaas VF-3/VF-66Plates, bases and repeat runs
3-axis millingHision5Parallel capacity for volume
TurningCNC lathe3Shafts, bushings and turned parts
Wire EDMWire cuttingHardened stock, sharp internal corners
WeldingTIG · MIG · LaserWelded assemblies on fixtures
MetrologyCMMFirst article and per-lot sampling
AssemblyManual and robotic cellsFinished unit, packed and labelled

Exact envelopes, spindles and per-machine tolerances: to be confirmed with the shop.

01 · 5-axis milling

One setup, five faces

The Axile centre with hyperMILL programming runs simultaneous 5-axis strategies verified in simulation before we touch material. Fewer setups means less stacked error: the relationship between holes and surfaces holds because the part is never released.

  • hyperMILL programming as a certified partner
  • Collision simulation and toolpath verification
  • Contoured surfaces with no polishing afterwards
  • Ideal for one-piece prototypes with no tooling
AXILE 5-axis machining centre with hyperMILL programming
02 · 3-axis milling and turning
Haas and Hision 3-axis machining floor

Eleven centres and three lathes for volume

Six Haas VF-3 to VF-6 and five Hision run in parallel, so a released program can be duplicated onto another machine the same day without re-validating the part. Three CNC lathes close out the turned parts of the same assembly.

6
Haas VF-3/VF-6
5
Hision 3-axis
3
CNC lathes
03 · Wire EDM and welding

The two processes that usually get subcontracted

Coming soon · Q1 2027
Post-process
Anodizing · Alodine · Electropolishing

When wire cutting and welding live outside, each one adds transit, queue and a seam of accountability. Here they are in the same building as the machining and the metrology.

Wire EDM

Cutting in already-hardened material with no cutting force and no distortion: sharp internal corners, narrow slots, punches and dies. It is the process that rescues a part when the design leaves no room for a cutter radius.

TIG, MIG and laser welding

Three processes chosen per joint rather than per availability: TIG where finish rules, MIG where deposit rules, laser where distortion rules. Parts are welded on fixtures machined in house.

CMM and assembly

Measurement happens between operations, not at the end, so a deviation is corrected while the part is still on the machine. The final assembly ships labelled and packed as a single unit.

04 · Capacity

Prototypes

24-hour quoting and a reserved machine window for one-off parts, so a prototype does not wait behind a production run.

Repeat runs

Programs and fixtures are kept by part number. The second order enters with no re-engineering and the same released inspection plan.

Materials

Carbon and alloy steels, stainless, hardened tool steel, aluminium and brass, with heat certificates tied to the lot.

For purchasing

One purchase order covers machining, EDM, welding, inspection and assembly: one shipment, one invoice, one accountable contact.

05 · Tolerances

Precision machining tolerance

Metals, PEEK and ULTEM with drawingOther plastics with drawingNo drawing
Linear dimension±0.0025 mm
±0.0001 in
±0.05 mm
±0.002 in
ISO 2768 Medium
Hole diameters (not reamed)±0.0025 mm
±0.0001 in
±0.05 mm
±0.002 in
ISO 2768 Medium
Shaft diameters±0.0025 mm
±0.0001 in
±0.05 mm
±0.002 in
ISO 2768 Medium
06 · Materials

CNC machining materials

A2 Tool SteelABSAcrylicAluminumBrassBronzeCast IronCopperDelrinGarolite G-10HDPEInvarKovarMagnesiumNylonPEEKPolycarbonatePolypropylenePPSPTFEPVCStainless SteelSteelTitaniumTool SteelTorlonUHMWUltemZinc

Send the file and we tell you which machine it lands on

An answer within 24 hours with proposed process, price and a committed date.

Upload a part